A/V Equipment Cabinet
First Presbyterian Church, Waverly NY
Click on thumbnails for larger view.
This equipment cabinet is made of solid poplar. All the trim and the beaded t&g was made in my shop. It was designed to mimic the half wall that separates the pulpit from the choir area. The church is over 150 years old, and the detail in the woodwork is beautiful. When I got to the finishing of this piece, I distressed the finish to make the piece look as old as the rest of the woodwork in the sanctuary.